Skip to product information
1 of 6

Mega Vending

Coffee Inns Dollar Bill Changer Update Validator Kit-Replace JCM DBV10 20 30 ZBA

Coffee Inns Dollar Bill Changer Update Validator Kit-Replace JCM DBV10 20 30 ZBA

Regular price $92.00 USD
Regular price Sale price $92.00 USD
Sale Sold out
Shipping calculated at checkout.

Coffee Inns Dollar Bill Changer Update Validator Kit-Replace JCM DBV10 20 30 ZBA - Free Shipping

Condition: New

Upgrade your Coffee Inns Dollar Bill Changer with this brand new validator update kit, designed as a direct replacement for obsolete JCM DBV01, DBV10, DBV20, DBV30, and ZBA validators.

If your existing bill validator is defective, this replacement kit provides a fast and reliable solution to restore your changer to full working condition. The kit includes a new validator and harness, designed to connect directly to your changer’s power supply board.

If the power supply board is faulty, it must be repaired before installing the new validator.

 

Features:

  • Accepts $1, $5, $10 and $20 bills
  • Direct replacement for JCM DBV01, DBV10, DBV20, DBV30
  • Compatible with ZBA validators
  • Includes new harness (board-to-validator connection)
  • Four-way bill insertion acceptance
  • Designed specifically for Coffee Inns dollar bill changers

 

Specifications:

General

  • Acceptance Rate: 96% or greater
  • Transaction Time: Approx. 1.5 – 2 seconds
  • Interface: Pulse / RS232 / ccTalk / ID003
  • Installation Site: Indoor use
  • Bill Insertion: Four-way acceptable

Electronic

  • Power Source: 12V DC ±10%
  • Standby Consumption: 0.1–0.16A (1.2W–1.9W)
  • Operation Current: 0.5A (6W)
  • Maximum: 1.2A (14.4W)

Operating Conditions

  • Operating Temperature: 0°C – 60°C
  • Storage Temperature: -10°C – 80°C
  • Humidity: 20% – 70% RH (no condensation)

Machine

  • Bill Acceptor Width: TB74 – 62mm to 74mm
  • Weight: 310g

·         

Installation Notes (see picture):

  • The new validator connects directly to the power supply board.
  • The power board is located behind the tube assembly and is secured with two screws.
  • Always unplug power before attaching the new harness.
  • Ensure the power supply board is functioning correctly before installation.

 

 

Materials

Shipping & Returns

Dimensions

Care Instructions

View full details

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.